ReturnTo: Masters Project INDEXReturnTo: Masters Campus Master Plan - page 1 of 3
Masters Campus Master Plan
Phase I Options: Ia (to be named)
notes on a Phase I option learning environment and “school of the Future” employing a portion of the Phase II build out
 
This Phase I Option of the Masters Campus shows building the phase II second level over the South East corner of the existing 1950s one story Academy building. The structure, on a 7 foot hexagonal module, is a steel-wood composite prefabricated system which spans over, out and down over, the existing building opening the first floor for a variety of new spaces and functions. My partner in this project, architect Adam McIntyre, developed this design, its structural schema and rendered the drawings shown. This design employs the multi-module and realizes the first example of the first two levels, of three, vertical tired evolving forms of the new Campus architecture.
 
 
an architectural system...
modular kit of
 
The top
 
This
 
 
 
an application...
Employ
 
The experience
 
The
 
 
click on the drawings and pictures below to go to supporting documents
 
link coming
link coming
link coming
link coming
 
link coming
link coming
link coming
link coming
 
 
a piece of THERE...
The Masters Campus is conceived to develop in three overlapping phases. Of the three, Phase II will be the longest in duration and will occur where there is the heaviest use of existing facilities. Phase I, primarily, serves three functions: first, to develop needed space so that expansion of the primary grades can take place without interruption; second, to the extent possible to open up extra space so that there is staging ability as various Phase II work is performed; and last - to the greatest possible degree given time and financial resources - point the way to what the future Campus will become. A Taylor Axiom is “You cannot get THERE from HERE but you can get HERE from THERE.” In order to develop feasible Phase I options, it is necessary to first accomplish a comprehensive model of the end state of the fully developed Masters Campus and then work back to today’s conditions in order to “create the problem” of the first work to be built.
 
Directly
 
 
 
The
 
 
 
 
link coming

link coming
link coming

link coming
 
 
 
How a
 
 

This configuration

 
 
 
 
 
 
 
 
 
 
theme...
The
 
 
 
language...
language and
 
 
 
 
link coming
link coming
link coming
link coming
 
a matrix of criteria:
mob
ada
economy-ecology
the
The
provide
 
integrating
The
provide
 
entry
There is no
provide
 
sec
Two
provide
 
the
The
provide
 
gove
Gover
provide
 
student
The student
provide
 
valu
Problems
provide
 
integ
The
provide
 
design
A majo
provide
 
tec
Techno
provide
 
staying
Technology
provide
 
technology
The use
provide
 
rem
Transport
provide
 
role
Every
provide
 
 
This
 
 
Another
 
 
 
link coming
 

link coming

 
 
ReturnTo: Masters Campus Master Plan - page 1 of 3
 

SolutionBox voice of this document:
VISION • STRATEGY
SCHEMATIC

 
click on graphic for explanation of SolutionBox
Return To Index
Return To Masters INDEX
posted: March18, 2010 • revised March 18, 2011 - 12:49 PM @ Nashville Studio • © 2011 Matt Taylor, tsmARCHITECURE, Adam Mcintyre Architect