Posted below are drawings and notes related to revisions and additional detail of my work, as well as, corrections and/or suggested revisions and details of the Design Build Use (D/B/U) team’s work. I will send out an e-mail with a link to team members I believe should view one of these postings. Please pass the link on to anyone else you believe should have the information. The number in the upper right hand corner of each memo is an anchor. If you add the #sign plus the number of any specific memo to the URL of this page and send this to anyone they will be taken direct to the information you want.

Note that all postings will be in reverse chronological order.

Although I will make every attempt to send links to those who I believe should see a particular memo, I recommend that everyone periodically check this section of the site to make sure a critical communication is not missed. In addition, I recommend that each of you look at materials broader than your own area of expertise and concern. Knowledge of the whole project, on everyone’s part, is key to collaboration and success. Please do not be shy in making recommendations for improving anything that you see needs it even if it is not you area of responsibility.

Any materials sent to me will be posted here if requested or if I think that it will add value.

Matt Taylor
March 25, 2006

 
 

The 10 Step Process is a MG Taylor Model and Method for keeping a ValueWeb requisite with the changes in a project or enterprise and to build a knowledge-base as a consequence of day-to-day interactions.

Click on the 10 Step Process model diagram (above) for a fuller explanation.

aaaaaaaaa

 
 
 
1

MEMO #1

to: Irina
date: April 1, 2006 15:28 @ Turin
from: Matt
re:
PODs

The PODs with the turntables - the two large ones, not the KWIB - have to be sunk into the finished floor so that the turntable surface is level with the wood floor.

The AI shop drawings will show this. The new finish floor is to be 32 cc above the existing floor. The turntable mechanism may require more than this. Bill Blackburn is doing the final design drawings on the POD.

Irina, please reflect this on your 3d model and make sure that the Permasteelisa Team has the approprite dimensons necessary to provide the correct cut into the existing floor (if required) and allow the correct clearance and trim at the finish floor level.

see: Finish Floor Plan link: unicredit_2-5_sh_4_large_w_arm.pdf

 
posted: March 25, 2006 • updated: April 1, 2006 - 15:28 Turin time
o t h e r d d r a w i n g s
ver 2.5 drawing INDEX
link coming
GoTo: UniCredit NavCenter INDEX
GoTo: ver 2.5 Line Drawings INDEX
Link: Program Statement
Link: Project Phasing Options
Link: Specifications - 1
Link: Specifications - 2
Link: Specifications - 3
Link: Drawings INDEX
Matt Taylor INDEX