Vanderbilt
Children's Hospital |
| The
following are the most recent documents (drawings,
specifications, work orders, etc.) for building and
equipping the VCH Executive offices. They are organized
in two sections. The first contains Design Development
documents for the Design/Build Team [see
below];
the second, is composed of the actual contract documents
that have resulted from the Team’s interactions. |
| Click
on these drawings for larger scale drawings with
notes and pdf downloads. |
|
Matt
Taylor
Kingbridge Center
October 2, 2003
|

SolutionBox
voice of this document:
VISION STRATEGY DESIGN DEVELOPMENT
|
posted:
October 2, 2003
revised:
October 11, 2003
• 20031002.928291.mt • 20031011.402092.mt •
(note:
this document is about 15% finished)
Copyright© Matt