SDC
Environment

Costs
i
t e r a t i o n - o n e
|
| This
cost estimate is organized into 44 Work Packages by
Phase. Added to these 44 Packages is a contingency figure
of 10%. The Contingency will be controlled and distributed
by the Sponsor Team on an as-needed basis. |
|
|
Phase
I: Demolition & Exterior Work
|
|
|
P1-wp5
Demolition
|
Interior
West, North and East Wings
No work @ Auditorium or 4th floor East Wing
|
reference:
p. 228
|
|
P1-wp7
Abatement
|
Interior
West, North and East Wings
No work @ Auditorium or 4th floor East Wing
|
reference:
BJ (1/3 due to P1-wp5)
|
|
P1-wp10
Cleanup
|
Entire
Site
Interior and Exterior
Debris Removal
|
reference:
p.228
|
|
P1-wp15
Parking
Areas
|
Repair
of Asphalt
Paint Parking Spaces
Lighting (West Parking only)
Security Fencing (West Parking only)
250 lf of Trellis (10 ft. high - 10 ft.wide)
Landscaping (Perimeter of Building and Parking
Areas)
155
parking places provided
|
reference:
p. 226 & 228lh
|
|
P1-wp20
Access
to Streets
|
Cut
Curbs
Concrete Curbs
Asphalt cutting
Painting - lane markers
|
reference:
BJ (unusual conditions); p. 229
|
|
P1-wp25
Drainage
|
Repair
Existing Storm Sewers
New Lines and Grates
Grading
Asphalt repair
|
reference:
p. 229
|
|
P1-wp30
Building
Parameter Waterproofing
|
Excavation
Waterproofing
Asphalt Repair
Landscaping Areas
|
reference:
p. 229
|
|
P1-wp33
Roofing
|
West
Wing - New
North Wing - New
East Wing - Repair
Skylight @ Town Square Atrium
Note:
This work can be spread over Phases I &
II with some extra cost for temporary measures
and increased risk of damage.
|
reference:
BJ & p. 228
|
|
P1-wp35
Site
Repair
|
Curbs
Walks
Entry Platforms
Paving
|
reference:
p. 229
|
|
P1-wp40
Exterior
Doors
|
Repair
Doors and Bucks
Replace Doors and Bucks
Hardware
Panic Hardware
Emergency Lighting w/ battery
Repair
existing and replace as necessary.
|
reference:
p. 227
|
|
P1-wp45
Exterior
Masonry Repair
|
Cleaning
Pointup
Note:
This work can be spread over Phases I &
II..
|
reference:BJ
(15k may be able to come off of this) p.230
|
|
P1-wp50
New
West Entry
|
Canopy
Glass Walls
Platform
Paving repair
|
reference:
p. 228
|
|
P1-wp55
New
Ornamental Fence & Gates
|
At
new North and South Courtyards (Phase II
development)
|
reference:
p. 229
|
|
P1-wp60
New
Signage
|
At
Street - 3
At Parking Lots - 6
At Building Entries
- 3
|
reference:
p. 228
|
|
Phase
I Demolition & Exterior Totals
|
|
|
|
P1-wp105
Temporary
Barriers
|
6
Total
Plywood with locable Doors
Graphics
|
reference:
p. 229lh
|
|
P1-wp107
Elevator
reference:
p. 562 Means
|
|
P1-wp110
HVAC,
Other Mechanical Work
|
Separate
Contract
Phase I Schedule
Must be coordinated with Phase I Work
|
reference:
Jeff Mason
|
|
P1-wp110a
Electrical
|
Repair
and run new electrical as required.
Fire A;larm System
|
reference:
p. 230
|
|
P1-wp115
Plumbing
as Required
|
Clean
and Repair
Replace Fixtures (only as necessary)
|
reference:
p. 230
|
|
P1-wp120
Refurbish
Hallways and Stairways
|
Clean
Paint
Patch/replace floor covering
|
reference:
p.
|
|
P1-wp125
Prepare
34 Classrooms for Use
|
Floors
1, 2 & 4 (Only)
Floor Covering
Painting
Repair Casework (where possible)
Signage
Locks (where required)
|
reference:
p.
|
|
P1-wp130
Security
Office
|
Office
Surveillance System
Interior halls, building corners, Courtyards,
Parking
|
reference:
p. 230
|
|
P1-wp135
Administrative
offices
|
Basic
Office Shells
Glass to Hallways
Glass over Partitions
Doors, Locks, Signage
Floor Covering, Paint
Some Lighting (in addition to overheads)
Basic Armature System
Joseki Level
|
reference:
p. 230
|
|

|
View
from New Lobby
into Admissions Office
|
|
|
P1-wp140
Town
Square Area and Atrium
|
2
story Atrium under opening Skylight
Glass walls
Landscaping
Seating
- benches
Kiosks
|
reference:
p. 229lh
|
|
P1-wp145
Lobby
|
Floor
Finish
Seating Area
Security Station
Adjacent to Security Office
|
reference:
p. 229lh
|
|
P1-wp155
Collaborative
Work Area
|
Joseki
Style
1st Floor
Full level Completion and Furnished
Stairway to SDC ValueWeb Community Room (above)
Open
to Hallway
|
reference:
p. 229lh
|
|
P1-wp115
SDC
ValueWeb Members Community Room
|
NavCenter
Style
2nd Floor
Full level Completion and Furnished
Stairway
to Collaborative Work Area (below)
Open to Hallway
Glass Wall in Hall (North) is Phase II
Computing, Web Access & Multimedia
|
reference:
p. 229lh
|
|
P1-wp199
Energy
Retrofit
|
Separate
Contract
Phase I Schedule
Must be coordinated with Phase I Work
|
reference:
Jeff Mason
|
|
|
|
P2-wp10
Library
Facilities
|
Full
level Completion and Furnished
Case Work, soft seating, work areas
Printing, High Speed Internet Access
|
reference:
p. 231
|
|
P2-wp20
Student
Union
|
Full
level Completion and Furnished
Case Work, soft seating, work areas
Printing, High Speed Internet Access
|
reference:
p. 231
|
|
P2-wp30
Add
Features and Amenities to Prior Areas
|
Classrooms,
Administration, Town Square, Lobby, Collaborative
Workroom, SDC ValueWeb members Community.
Trim
Built-ins WorkFurniture, TechnologyLighting,
Interior Landscaping
|
reference:
p. 231
|
|
P2-wp40
North
Entry
|
Canopy
Glass Walls
Platform
Paving repair
|
reference:
p. 228
|
|
P2-wp50
Complete
SDC ValueWeb Members Community Room and Adjacent
hall
|
Glass
Walls at North Wall (Hall - external wall)
WorkFurniture
Technology Upgrade
|
reference:
p. 231
|
|
P2-wp60
Glass
Connection between West and East Wings - 1st Floor
Level.
|
Glass
Walls
Remove existing structure to second level
Coordinate with Landscaping (P2wp70)
|
reference:
p. 231lh
|
|
P2-wp70
North
and South Landscaped Courtyards
|
Remove
Paving
Patios
Planting
Remove
2nd floor Bridge between West and
East Buildings at North Patio
|
reference:
p. 231lh
|
|
P2-wp80
Entry
and Stairway to Second Level - North Courtyard, East
Wing
|
Remove
Paving
Remove Existing Entry
Ramp to First Floor Level
Stairway
to Second Floor Level
|
reference:
p. 231lh
|
|
P2-wp90
Upgrade
HVAC
|
Begins
Modernizarion Process
|
reference:
Placeholder
|
|
|
|
P3-wp15
Performing
Arts Center
|
House:
750
Live and Multimedia
Inteface with Student Union
|
| Cost
Turn Key: |
$3,200,000
|
reference:
p. 227
|
|
|
|