The purpose of this page is three fold. To document our use and development of the KnOwhere spaces. To capture our future plans and ambitions. The Hilton Head Store is about 40% finished; the Palo Alto Store about half done. The third is to provide project management information on the many ongoing projects that constitute our present upgrade path.

Both Stores are enjoying heavier use and the general, financial improvement of the Enterprise means that it is now possible - and necessary - to move closer to our “end state” model.

...Hilton Head Store:

 

We have rented additional space at Hilton Head and opened that space to our original facility. At the present time, this addional space is underutilized because it is chopped up in a conventional mannor.

Over the last 18 months we have lacked the funds to redo the space. If we are to make Hilton Head vialbe, we have to expand its capibility. KnO hh 200 is necessary work to sort out the options, costs and timing aspects necessary to moving forward.

 

Develop Build Out Plans for Additional Space
& Remodeling of Existing

 

   
  Activity - KnO hh 200

Jerry’s electronic drawings have to be found, translated to Canvas and sent to Matt (bb); Drawings revised (mt); Plan review by entire KnOwhere community (all); Design Development (MT); Pricing and Plan review (so).

 
  Date Started January 3, 2000  
  Date Due March 1, 2000  
  Owners Patsy K., Lori B., Matt T., Skip O.  
  Completion Spec

We have an adequate set for Building department plan check and contractor pricing.

We understand the different options that we may have so that we can move forward, incrementally, as money is available. This step by step path has to be possible without too much disruption and money waste.

 
  Status There is a partially finished set of drawings that Jerry Headly did in 1988.  
   

 

There are a number of short and mid-term projects that have to be executed at the Hilton Head Store. They will be listed ASAP. e-mail me if you have any in mind.

...Palo Alto Store

 

The Palo Alto Sore has a near infinite number of projects that need doing. The most critical relate to getting the Second Floor level up to full capability. When the Store opened, two years ago, there was was not sufficient capital to do this. Because of this we have had minimal use and only modest success with this aspect of our program.

Now however, market demand and our growing financial health is converging to make a new opportunity. We are attracting a great mix of ValueWeb members and incubation programs. Proper use of our Second Floor resource can pay a big chunk of our Overhead, in the short term, and provide significant Capital Growth (through the Incubation work) over a two to three year period.

 

Install Glass Wall Between flypaper.com
and Radiant Room

   
  Activity - KnO pa 200

Confirm Wall pieces (jg); Get list of installer companies from manufacturer (js); develop Head, Sill, Jamb detail (MT); Estimate costs (JG, JS); Locate money (Js); Supervise installation (jg); Color selection (MT); Coordinate painting process (jg); Coordinate with KnOwhere people and flypaper.com (Js);

 
  Date Started January 11, 2000  
  Date Due Tuesday February 1, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

Blocking complete at Head; painting of Sill and balcony railing done prior to glass being set; Jamb detail determined and trim installed at round column.

Work to be done before and not disturb the start of the February 2 EA DesignShop® event.

 
  Status

Wall components are in our storage unit. None of us have installed this wall before. We will need help with the physical work part of it, as well as, some of the technical aspects. Money for installation labor, painting and some materials is required.

This is critical. Time is extremely short. This is a complex little project and should not be underestimated.

 
   

 

Complete flypaper.com Space
Set Up

   
  Activity - KnO pa 201

flypaper.com Cube Wall system is set up but needs inserts (jg) and a final tieing together; Confirm layout (MT, Js, jg); the WorkWall has to be reconfigured to three panels (jg); Complete electrical wiring (jg); Phone a LAN wiring installed (rw);

 
  Date Started November 14, 1999  
  Date Due Tuesday January 20, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

I want to make sure that this space really works. I am not sure it does.

I want to make sure that the furniture is being used to its best strength and is specifically set up to support the work that is actually being done.

Plants, books for the shelves, artifacts - make this photo-ready.

 
  Status

We have completed the basic layout - we need to refine it and finish it.

Cube Office elements are here but are not assembled.

I am not happy with the removed Pod section - I want to review the space for functionality and projected us. A little more space may be necessary for this to work for flypaper on an optimal level.

This is time critical - too much time has passed.

 
   

 

Complete Caucus Space
Set Up

   
  Activity - KnO pa 202

Confirm layout with Gary (MT); Complete wiring (rw); final set up Cubes with inserts (jg); clean up (Js); Swap out Work Station by window (Js);

 
  Date Started January 11, 2000  
  Date Due Tuesday February 18, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

Plants, books for the shelves, artifacts - make this photo-ready.

 
  Status

In progress.

 
   

 

Mock Up Work Station System
Along West Wall - 2nd Floor

   
  Activity - KnO pa 203

Order 3 more Cube Office work tops from AI (Js); Relocate the Kellogg’s work stations (jg, Js, MT); Assemble Cube Office inserts (jg & crew); determine layout (MT:Js,jg); Run electrical (jg); Run LAN and phone lines (rw); Set bases for rest of layout (jg); Install lighting along the entire row (jg);

 
  Date Started January 11, 2000  
  Date Due Tuesday February 18, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

Must be completed prior to the working session with Martin and his (startup incubator) Team.

Plants, books for the shelves, artifacts - make this photo-ready.

This, along with the completion of flypaper.com (knO pa 201), Kodak (knO pa 204), and Caucus (knO pa 202), will put the second floor into basic shape and tell us how much more capacity we have left.

 
  Status

Cube inserts are here but not assembled. John is going to need willing help hands to do this and build the bases.

We will need money for the lighting.

This is time critical.

 
   

 

Reset and Finish Kodak Space
2nd Floor

   
  Activity - KnO pa 204

Assemble Cube Office inserts (jg & crew); determine layout (MT:Js,jg); Run electrical (jg); Run LAN and phone lines (rw); Install lighting for entire space (jg);

Design & Develop details for WW integration to Cube Office system (jg, MT, bb);

Finish various storage cubes around Kodak and Caucus entry areas (jg);

 
  Date Started January 11, 2000  
  Date Due Tuesday March 15, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

Make the existing layout work after confirming the layout with Kodak.

Integrate the WorkWall® system with the Cube Office™ system.

Solve lighting issues.

Plants, books for the shelves, artifacts - make this photo-ready.

 
  Status

Cube inserts are here but not assembled. John is going to need willing help hands to do this and build the bases.

We will need money for the lighting.

Some work furniture may have to be swapped out.

 
   

 

Reset and KnOwhere, Yolke MG Taylor and iterations
Space - 2nd Floor

   
  Activity - KnO pa 205

Assemble Cube Office inserts (jg & crew); determine layout (MT:Js,jg); Run electrical (jg); Run LAN and phone lines (rw); Install lighting for entire space (jg);

Design & Develop details for WW integration to Cube Office system (jg, MT, bb);

Determine if glass wall is needed see: (knO pa 202) (all users);

 
  Date Started January 11, 2000  
  Date Due Tuesday March 25, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

iterations: Space for Jeff Johnston.

Yolke: Space for Russ, a programmer and equipment.

MG Taylor: Space for Gail and Todd.

KnOwhere: Space for Richard.

MG Taylor and KnOwhere spaces have to support high frequency interaction.

Integrate the WorkWall® system with the Cube Office™ system.

Solve lighting issues.

Plants, books for the shelves, artifacts - make this photo-ready.

 
  Status

Cube inserts are here but not assembled. John is going to need willing help hands to do this and build the bases.

We will need money for the lighting and more work furniture.

Materials are being taken from the present area to finish up other spaces.

 
   



Determine Use of “Exercise” Area
and Activate Shower Facilities- 2nd Floor

   
  Activity - KnO pa 206

Determine use (KnOwhere management).

If use is to be a Conference Room, electrical, LAN, phone and Lighting has to be added (contractor); wall mounted WorkWalls will be required (Js - order & jg - install).

If use is exercise and massage then appropriate equipment has to be ordered (Js).

In any use, the hall way into it can be used for lockable Cube Office system storage (jg).

 
  Date Started January 11, 2000  
  Date Due Tuesday April 1, 2000  
  Owners Jeff S., Matt T., John G.  
  Completion Spec

This is prime space. It is the only enclosed private room in the facility. We should use it well and lever the asset better that we have.

 
  Status

Now being used as ad-hoc Conference Room with wires running in through the door. Not good!

Capital will be required to complete this project - $5,000 +/-

 

 
   

 

 

These projects, (knO pa 200 - 206) will bring the Second Floor up to a useful, credible and profitable level for the first time.

 

Palo Alto
January 12, 2000


posted January 12, 2000

revised January 13, 2000
• 20000112.21081.mt •

(note: this document is about 20% finished)

Search For:
Match:  Any word All words Exact phrase
Sound-alike matching
Dated:
From: ,
To: ,
Within: 
Show:   results   summaries
Sort by: